Banknote acceptor for compatible gaming cabinets. Identify the actual model and validate the supported currency, power requirements, interface, mounting space and harness before ordering.
Banknote acceptor for compatible gaming cabinets. Identify the actual model and validate the supported currency, power requirements, interface, mounting space and harness before ordering.
The image is a reference example. Please provide existing component photos or markings, the target gaming cabinet or board model, connector specifications and required quantity so the correct variant can be selected. No specific unverified rating or model is claimed.
| Product Type | Gaming cabinet bill acceptor |
|---|---|
| Model / Brand | Verify from unit label or reference photo |
| Supported Currency | Confirm required country and banknotes |
| Power Input | Match the actual bill acceptor label |
| Communication Interface | Confirm game board / controller protocol |
| Stacker / Mounting | Verify included stacker, mounting space and brackets |
| Wiring Harness | Match connector and pinout before connection |
Share the equipment model, required configuration, quantity and destination. Availability, exact specification and quotation will be confirmed before order acceptance.
Contact QH Gaming Machine with your reference details.
Send the part model or number, cabinet model, front and rear photos, dimensions and connector details. Describe the function and required quantity.
Appearance alone does not confirm fit or electrical compatibility. Compare mounting dimensions, voltage, pinout, protocol and rated load where relevant.
Measure the outer size, mounting-hole spacing, installation cutout, available depth and required clearance. For brackets or locks, include the relevant drawing.
Provide operating voltage, current or power rating, connector type, polarity and pinout. Use the part only within the specifications confirmed for the supplied model.
Provide both connector-end photos, pinout, cable length, wire requirements and connected-device models. Confirm the harness drawing before production.
Provide button type, cutout size, mounting method, illumination requirements and connector or pinout. Confirm the control-panel layout and wiring.
Provide strip or module size, voltage, controller type, connector, cable length, required colors and lighting effects. Confirm the complete lighting configuration.
Provide mounting dimensions, material, orientation, lock cylinder or key requirements and cabinet photos. Similar-looking parts may have different mounting arrangements.
Check the dimensions, voltage, current rating, connector, airflow or load requirements and installation clearance for the original component.
Check the packing list for the exact item. Cables, screws, brackets, controllers and other accessories are included only when specified in the quotation.
Send drawings, material and finish requirements, electrical details where relevant and quantity. Feasibility, sample requirements and production timing are confirmed per project.
Request sample availability and a quotation. Compare the sample with the actual cabinet and test its intended function before confirming bulk supply.
Send an itemized list with model or part number, required specifications and quantity for each item. Confirm availability and packing for the complete list.
Disconnect power for electrical parts and stop installation. Send the order reference, labels, measurements and photos of the original and replacement parts for comparison.
Request the confirmed packing method, package weight, production time and warranty terms for each part. These depend on the model and order scope.